Job Description: The Northville Cider Mill needed a trowel down system applied to their floor to help insure the best possible drainage. Also several cracks needed to be filled and leveled out. After blasting and cleaning the floor, a quartz stone system was applied and sealed with a chemical resistant urethane topcoat. The finish is slip resistant to ensure the safety of employees.