Project:Visi-Trol
Project Size: 45,000 SF
Manager: John Ford
Job Description:
The project at Vis-Trol was a complete retro-fit of the building. Engineered Coating Systems completed both the interior and exterior painting as well as the floor coating installation. The floor was blasted to insure proper preparation of the substrate. Following the blast process all necessary repairs were made and the joints were filled to grade. Once this was completed 2 coats (prime and intermediate) of 100% Solids epoxy with a coat of chemical resistant urethane was installed. Giving the finishing touch to this building.